Gulf LNG Energy Files Draft Resource Reports with FERC

Gulf LNG Energy has filed draft resource reports as part of FERC’s pre-filing environmental review of its proposed liquefaction and LNG export terminal to be located at Gulf LNG’s existing LNG import terminal at the Port of Pascagoula, Miss.  Draft Resource Report No. 1 (General Project Description) can be found here, and additional reports and the complete pre-filing docket can be found on eLibrary under Docket No. PF13-4.

 

 

Back to top