NextDecade Expects to File for FERC Pre-Filing Review in January 2015
The Brownsville Herald reports that NextDecade expects to file a request in January 2015 to begin FERC’s pre-filing environmental review process for a proposed LNG export terminal at the Port of Brownsville, Texas. The pre-filing request would include a proposal for an interconnected 125-mile-long pipeline, 36 to 42 inches in diameter, with a capacity of 1 Bcf/day. NextDecade is also considering constructing an LNG export terminal at the Port of Galveston, Texas.