Hearing to Consider Pipeline Route From Canaport LNG to United States
Platts LNG Daily reports that Canada’s National Energy Board (NEB) will hold a public hearing on January 28 to consider the best possible route, construction schedule, and methods for the Emera Brunswick Pipeline, which is expected to transport regasified LNG from the Canaport LNG terminal in St. John, New Brunswick, to the United States. The Hearing Order and associated documents are available on the NEB’s online docket system.