FERC Conditions Construction of Calypso Pipeline on Authorization of LNG Terminal

Platts Gas Daily reports that FERC has authorized Calypso U.S. Pipeline, LLC to begin construction of its Florida-based pipeline upon either the Bahamian government’s authorization of the proposed Suez LNG terminal and associated pipeline, or the U.S. Maritime Administration’s authorization of the proposed Calypso LNG terminal and associated pipeline off the coast of Florida. Additional details may be found in the FERC order, available in the eLibrary in Docket No. CP01-409.

Back to top