FEIS/FEIR Identifies Risks Posed by Proposed BHP Billiton Terminal

The Los Angeles Times provides local coverage of the Cabrillo Port final environmental impact statement, filed March 9, 2007.  The FEIS/FEIR lists numerous mitigation measures designed to avoid or alleviate impacts, but states that “a number of adverse effects would remain significant and unavoidable.” Public hearings on the FEIS/FEIR are set to take place in April. The document is available through DOT’s Docket Management System in Docket No. 16877.

Back to top