Cove Point LNG Updates Design Information for Pier Reinforcement Project
Dominion Cove Point LNG, LP has filed updated design information regarding the proposed pier reinforcement project with FERC, including a modification to the breasting dolphin pilings and a downward revision to the amount of dredge spoils that will be produced during the project. The filing is available in the Commission’s eLibrary under Docket No. CP09-60.