Canadian NEB Announces “Rolled-In Toll Methodology” for Gros Cacouna LNG Project

The Edmonton Journal reports that Canada’s National Energy Board has decided to support a “rolled-in toll methodology” for an expansion of the Gros Cacouna LNG import terminal and pipeline infrastructure, requiring local utilities to contribute to the cost of the expansion. The Board reached the decision by determining that Gros Cacouna qualified as a receipt point, the same as conventional gas inlets.

Back to top